2050 customers in 17 countries 23 nationwide projects

  • Construction
  • Repair
  • Metallurgical industry
  • Cement and mining industries
  • Mining and processing plants and mine sites

Projects of Our Clients

Works performed by Tornado machines

Strengthening the embankment dam on the river

Strengthening the embankment dam on the river

Company: Private limited company "Dorozhno-pierierdvizhnaia mekhanizirovannaia kolonna "Bieloriecheinskaia" (Bieloriecheinskaia mechanized road column)
The company is in the business of construction and repair works.
Task:
Strengthening the embankment dam on the river in the village of Frontovoye near the city of Sevastopol.
Solution:
Wet shotcreting of the bulk channel bottom and side walls with a thickness of 50-100 mm was used to perform the task. The Tornado AC-5-3,5 shotcrete machine was used in the project.
Result:
Strengthening of the bottom and walls of the bulk channel was achieved using the shotcreting method. The company is using the machine to perform further works as well.
Used Equipment:
AC-5 wet shotcrete machine AC-5 wet shotcrete machine
Construction of the water pipeline, considering the water supply

Construction of the water pipeline, considering the water supply

Company: Private limited company "Goldman Construction" Kazakhstan
The company is in the business of providing a full range of water services.
Task:
Construction of the Eskulinsky water pipeline, considering the water supply; as well as the construction of a water tank.
Solution:
The standard configuration of shotcrete machine AC-1 with 40 m of working hose DU 32 will be used in this work.
Result:
The works were completed on time. Start-up and adjustment works were carried as well as training of the company's employees at the construction site.
Used Equipment:
AC-1 dry-mix shotcrete machine AC-1 dry-mix shotcrete machine
Repair of walls and ceilings of the industrial premises

Repair of walls and ceilings of the industrial premises

Company: Private limited company "SDK GROUP"
The company is in the bussiness of providing high-rise repair works.
Task:
Repair of walls and ceilings of the industrial premises at the Poltava Mining and Processing Plant.
Solution:
The standard configuration of shotcrete machine AC-1 with 20 m of working hose DU 32 was used in this work.
Result:
The company's employees were trained on the construction site and the premises were repaired
Used Equipment:
AC-1 dry-mix shotcrete machine AC-1 dry-mix shotcrete machine
An estimate for my
project
Send me

Our Clients Recommend Us